A .pdf version of the draft Environmental Impact Report (Draft EIR)
is available for viewing on-line or for printing.
|
Draft EIR |
File
Size |
Date |
|
***
Draft EIR (All Sections below in a large .ZIP file) *** |
31 MB |
5/15/2013 |
|
Cover
and Table of Contents |
912 KB |
05/13/2013 |
|
Section
1: Executive Summary |
527 KB |
05/13/2013 |
|
Section
2: Introduction |
62 KB |
05/13/2013 |
|
Section
3: Project Background |
2,399 KB |
05/13/2013 |
|
Section 4: Project Description |
2,807 KB |
05/13/2013 |
| Section
5: Environmental Analysis |
|
|
|
5.0 Introduction |
29 KB |
05/13/2013 |
|
5.1 Hydrology and Water Quality |
2,022 KB |
05/13/2013 |
|
5.2 Marine Biological Resources |
2,256 KB |
05/13/2013 |
|
5.3 Terrestrial Biological Resources |
1,559 KB |
05/13/2013 |
|
5.4 Land Use and Planning |
1,562 KB |
05/13/2013 |
|
5.5 Air Quality and Climate |
332 KB |
05/13/2013 |
|
5.6 Noise |
2,046 KB |
05/13/2013 |
|
5.7 Geology and Soils |
2,272 KB |
05/13/2013 |
|
5.8 Cultural Resources |
2,076 KB |
05/13/2013 |
|
5.9 Utilities and Service System |
164 KB |
05/13/2013 |
|
5.10 Aesthetics |
2,392 KB |
05/13/2013 |
|
5.11 Hazards and Hazardous Materials |
1,595 KB |
05/13/2013 |
|
5.12 Traffic and Transportation |
2,282 KB |
05/13/2013 |
|
Section 6: Growth
|
1,219 KB |
05/13/2013 |
|
Section
7: Cumulative Impacts |
2,727 KB |
05/13/2013 |
|
Section
8: Alternatives to the Proposed Project |
|
|
|
8.0 Introduction and Summary |
82 KB |
05/13/2013 |
|
8.1 Proposed Project Components |
209 KB |
05/13/2013 |
|
8.2 Alternatives to Proposed Project
Considered but Eliminated |
130 KB |
05/13/2013 |
|
8.3 Alternatives to the Proposed
Project |
1,315 KB |
05/13/2013 |
|
Section
9: Other CEQA Considerations |
46 KB |
05/13/2013 |
|
Section
10: List of Preparers and Contributors |
29 KB |
05/13/2013 |
Section 11: References
(References
are available to be viewed electronically at the
City/District offices. Fore more information on references,
contact Melanie Schumacher at
melanies@soquelcreekwater.org or 831-475-8501x153 |
131 KB |
05/13/2013 |
|
Technical Appendices for Draft EIR |
File
Size |
Date |
|
*** All
Appendices. A single file (large
.ZIP file) will be posted soon that contains all
of the appendices.
Recommended to only download this file if you have a
high-speed internet connection*** |
324MB |
5/16/2013 |
|
A. Scoping
Report City of Santa Cruz and Soquel Creek Water District (scwd2)
Regional Seawater Desalination Project |
17,338 KB |
05/13/2013 |
|
B. Evaluation
of Potential for Additional Long-Term Water Demand Reduction
through Water Conservation Measures |
276 KB |
05/13/2013 |
|
C. Evaluation
of Future Water Supply Shortages and Need for Supplemental Supply
Given Probable Habitat Conservation Plan Conservation Strategy
Flow Requirements |
527 KB |
05/13/2013 |
D. scwd2
Final Seawater Reverse Osmosis Desalination Pilot Test
Program Report & Appendices (.zip
file)
(This appendix is available in smaller files below for
easier access/download) |
25,199 KB |
05/13/2013 |
|
Appendix
D: Sections 1 through 8 |
4,801 KB |
05/13/2013 |
|
Appendix
D: Appendix A |
13,147 KB |
05/13/2013 |
|
Appendix D: Appendices B-F |
9,071 KB |
05/13/2013 |
E. Proposed
scwd2 Desalination Project Watershed
Sanitary Survey (.zip
file)
(This appendix is available in smaller files below for
easier access/download) |
21,584 KB |
5/13/2013 |
|
Appendix E: Sections 1 through 5 |
6,555 KB |
05/13/2013 |
|
Appendix E: Appendices A-C |
6,136 KB |
05/13/2013 |
|
Appendix E: Appendices B-F |
10,302 KB |
05/13/2013 |
F. scwd2 Seawater Desalination Program
Offshore Geophysical Study (.zip
file)
(This appendix is available in smaller files below for
easier access/download) |
62,349 KB |
05/13/2013 |
|
Appendix
F: Sections 1 through 8 |
9,146 KB |
05/13/2013 |
|
Appendix
F: Appendices A-H |
6,397 KB |
05/13/2013 |
|
Appendix
F: Appendix H (continued) and Appendix I |
11,672 KB |
05/13/2013 |
|
Appendix
F: Appendix I (continued)- Data |
9,114 KB |
05/13/2013 |
|
Appendix
F: Appendix I (continued) - Data |
10,065 KB |
05/13/2013 |
|
Appendix F: Appendix I (continued) - Data |
10,158 KB |
05/13/2013 |
|
Appendix
F: Appendix I (continued) - Data |
10,878 KB |
05/13/2013 |
|
G. City of Santa
Cruz Water Department & Soquel Creek Water District
scwd2 Desalination Program Open
Ocean Intake Effects Study |
6,958 KB |
05/13/2013 |
|
H. scwd2
Seawater Desalination Intake Technical Feasibility Study |
13,415 KB |
05/13/2013 |
I. Seawater Intake
Facility Conceptual Design Report scwd2
Regional Seawater Desalination Project (.zip
file)
(This appendix is available in smaller files below for
easier access/download) |
86,372 KB |
5/13/2013 |
|
Appendix I: Sections 1 through 7 |
4,01 KB |
05/13/2013 |
|
Appendix I: Appendix A |
25,904 KB |
05/13/2013 |
|
Appendix I: Appendix A (continued) |
15,480 KB |
05/13/2013 |
|
Appendix I: Appendix B |
7,650 KB |
05/13/2013 |
|
Appendix I: Appendices C - D |
2,626 KB |
05/13/2013 |
|
Appendix I: Appendix E |
9,044 KB |
05/13/2013 |
|
Appendix I: Appendix E (Continued) |
10,050 KB |
05/13/2013 |
|
Appendix I: Appendix E (Continued) |
9,666 KB |
05/13/2013 |
|
Appendix I: Appendix E (Continued) |
6,634 KB |
05/13/2013 |
|
J. Dilution Analysis
for Brine Disposal via Ocean Outfall |
508 KB |
05/13/2013 |
|
K. Site Selection
for Seawater Desalination Treatment Plant |
3,210 KB |
05/13/2013 |
L. scwd2
Seawater Desalination Plant –Phase 1 Preliminary Design –Volume
1 – Report & Volume 2 - Drawings (.zip
file)
(This appendix is available in smaller files below for
easier access/download) |
47,665 KB |
05/13/2013 |
|
Appendix
L: Sections 1 through 6 |
8,048 KB |
05/13/2013 |
|
Appendix L: Appendices A - E |
6,423 KB |
05/13/2013 |
|
Appendix
L: Appendices F - G |
8,663 KB |
05/13/2013 |
|
Appendix
L: Appendices H - I |
4,390 KB |
05/13/2013 |
|
Appendix
L: Drawings |
9,881 KB |
05/13/2013 |
|
Appendix
L: Drawings (Continued) |
10,140 KB |
05/13/2013 |
|
Appendix
L: Drawings (Continued) |
3,561 KB |
05/13/2013 |
|
M. Santa Cruz
Seawater Desalination Facility, Technical Memorandum on New
Storm Water Regulations for the Central Coast Region of the
Regional Water Quality Board |
3,340 KB |
05/13/2013 |
|
N. scwd2
Regional Seawater Desalination Project EIR Project Construction
Assumptions |
341 KB |
05/13/2013 |
|
O. Summary of
scwd2 Energy and GHG Reduction
Approach |
365 KB |
05/13/2013 |
|
P. City of Santa
Cruz and Soquel Creek Water District Agreements Related to the
Proposed Seawater Desalination Projects |
7,235 KB |
05/13/2013 |
|
Q. Water Quality
Data |
113 KB |
05/13/2013 |
|
R.
scwd2 Regional Seawater Desalination
Project Biotic Resources Survey Report |
5,475 KB |
05/13/2013 |
|
S. Desalination
Project for the City of Santa Cruz and Soquel Creek Water District
Report on Habitat Assessment for Overwintering Monarch Butterflies
|
2,553 KB |
05/13/2013 |
|
T.
scwd2 Regional Seawater Desalination
Project EIR Air Quality & Climate Calculations |
878 KB |
05/13/2013 |
|
U. Long-Term Noise
Measurement Data |
509 KB |
05/13/2013 |
|
V. Cultural Resources
Study for scwd2 regional Seawater
Desalination Project (Confidential due to the inclusion of
sensitive locational information) |
7 KB |
05/13/2013 |
|
W. Paleontological Record Search (Confidential due to the
inclusion of sensitive locational information) |
7 KB |
05/13/2013 |
|
X. Preliminary
Assessment for Disposal of Waste Flows From the Proposed
scwd2 Seawater Desalination Plant
to the City of Santa Cruz Sanitary Sewer System |
3,537 KB |
05/13/2013 |
|
Y. Potential Hazardous
Material Release Sites |
2,745 KB |
05/13/2013 |
|
Z. Current and
Potential Future Opportunities for Indirect and Direct Potable
Reuse of Recycled Water |
1,179 KB |
05/13/2013 |
|
AA. Intake Alternatives
– Review and Status of Subsurface Intakes |
101 KB |
05/13/2013 |
|
BB. Desalination
Plant Hydraulic Modeling and Analysis |
276 KB |
05/13/2013 |
|
CC. Comparison
of Desalination Technologies |
527 KB |
05/13/2013 |
|
DD. Additional
Seawater Reverse Osmosis Brine Disposal Options |
667 KB |
05/13/2013 |
|
EE.
Desalination Project Growth Review |
11,090 KB |
05/13/2013 |
|
FF. Conceptual-Level
Cost Comparison of Water Supply Alternatives |
524 KB |
05/13/2013 |
|
GG. Estimated
Cumulative Effects of scwd2 Desalination
Plant Intake on Fish Populations |
638 KB |
05/13/2013 |
|
Notification
Documents for Draft EIR and Public Hearings |
File
Size |
Date |
|
Notice of Availability
(NOA) |
1,844 KB |
05/10/2013 |
|
Public Notice in Santa Cruz Sentinel |
892 KB |
|
|
Public Notice- Mailer |
3.8 MB |
|
|
Press Release |
157 KB |
05/13/2013 |
|
Public Hearing Meeting Materials |
File
Size |
Date |
|
Handout: Program, Summary of Key Environmental
Findings, and Tips on How to Comment |
237 KB |
06/02/2013 |
|
Display Boards |
2,157 KB |
06/02/2013 |
|
Presentation |
4,161 KB |
06/03/2013 |
|
Comment Form |
189 KB |
06/02/2013 |
|
Scoping Process (November-December 2010) |
File
Size |
Date |
|
Scoping Report |
358 KB |
02/04/2011 |
|
Appendix A: Notification Materials |
2.9 MB |
02/04/2011 |
|
Appendix B: Scoping Meeting Materials |
8.5 MB |
02/04/2011 |
|
Appendix C: Sign-in Sheets and Comments |
11.2 MB |
02/04/2011 |
| Notice of Preparation/Initial
Study |
|
Notice of Preparation/Initial Study NOP/IS |
4.6 MB |
11/15/2010 |
|
Public Notice in Santa Cruz Sentinel |
495 KB |
11/15/2010 |
|
Public Notice - Mailer |
6.2 MB |
11/15/2010 |
|
Press Release |
90 KB |
11/15/2010 |
| Form to provide
comments through January 10, 2011 |
|
Scoping Comment Form |
131 KB |
11/22/2010 |
| Supplemental Information |
|
Display boards from 12/8 Scoping Meetings |
|
12/08/2010 |
|
Powerpoint Presentation from 12/8 Scoping Meetings |
|
12/08/2010 |
|
CEQA Informational Handout |
902 KB |
11/15/2010 |
|
CEQA Roadmap |
1.19 MB |
11/15/2010 |
|
Powerpoint Presentation- Overview of Environmental Review Process
|
1.7 MB |
11/15/2010 |